Meeting Dates:
Tuesday, November 4, 2025
Meeting Time and Location:
Live Webinar
1-3pm
Note:
ITRC's Pump & Treat (P&T) Optimization training aims to summarize existing information and best practices while also developing a systemic and adaptive optimization framework specifically for P&T well-network design and management.
P&T systems have been one of the most commonly used methods for hydraulic containment and treatment of contaminated groundwater at sites with large groundwater plumes. This method cleans up groundwater contaminated with dissolved chemicals by pumping groundwater from wells to an above-ground treatment system that removes the contaminants. Optimization of P&T remedies is important for maintaining contaminant removal effectiveness throughout the operation lifetime and managing the system toward an exit strategy. A strategy for routine optimization of P&T remedies is key for maintaining the contaminant removal efficiency of these systems.
Registration link:






